Pingxiang Daier Separation TechSep 11, 20262 min read

When Does a Packing Support Grid Need a Retaining Screen?

A retaining screen may be required when packing can pass through the primary support openings, but it introduces additional pressure-drop and fouling risk. Selection should be based on the smallest stable packing dimension, deformation, breakage, screen open area and service cleanliness. The retaining screen should not be assumed to carry structural load unless it is designed for that duty.
P
Pingxiang Daier Separation TechSep 11, 20262 min read

Ceramic Packing Support Grid Design for Acid Towers

A ceramic packing support grid can provide corrosion resistance in acid towers, but its design must account for heavy packing, liquid holdup, deposits, brittle behavior, thermal shock and uniform bearing. Installation impact and point loading should be controlled, while the grid must retain sufficient open area for gas and liquid flow.
P
Pingxiang Daier Separation TechSep 11, 20263 min read

How to Retrofit Tower Internals When Field Welding Is Prohibited

When field welding is prohibited, tower internals can sometimes be installed using existing rings, clips, bolted segments, split supports or engineered clamping systems. The solution must provide a verified structural load path while protecting the vessel lining and allowing installation through the manway. No drilling, grinding or shell loading should be assumed without project approval.
P
Pingxiang Daier Separation TechSep 11, 20262 min read

Why Segmented Liquid Distributors Leak at Field Joints

Segmented liquid distributors can leak through seams, bolt holes, distorted panels, unsuitable gaskets or incorrect field assembly. Because seam flow bypasses calibrated outlets, even modest leakage can cause local over-irrigation and reduce low-flow performance. Each joint should be classified by its structural and hydraulic function, with sealing, assembly and testing requirements defined before shipment.
P
Pingxiang Daier Separation TechSep 11, 20263 min read

How Much Clearance Is Required Between a Liquid Distributor and Packing?

Distributor-to-packing clearance must be measured from the actual discharge point to the installed packing surface. Excessive clearance can cause stream drift, splash and vapor deflection, while insufficient clearance can create mechanical interference and poor access. The required distance depends on distributor type, outlet trajectory, vapor flow, packing movement and installation sequence.