Separate nominal, supplied, fabricated and retirement thickness; define the actual damage mechanism; and check every internal at its end-of-life section for both structural and hydraulic performance.
P
Pingxiang Daier Separation TechSep 15, 20265 min read
How to Specify Corrosion Allowance and Minimum Thickness for Tower Internals
P
Sep 15, 20266 min read
How Cyclic Operation Causes Fatigue in Tower Internals
Define every recurring operating cycle, separate thermal and pressure cycling from high-frequency vibration, locate stress concentrations and verify fatigue life at the end-of-life section thickness
P
Sep 15, 20266 min read
How to Prevent Galvanic Corrosion at Tower-Internal Connections
Prevent galvanic attack by mapping dissimilar-metal interfaces, selecting compatible joint materials, controlling area ratio, isolating only where mechanically and electrically acceptable, and eliminating wet hidden crevices.
P
Sep 15, 20265 min read
How to Specify Positive Material Identification for Alloy Tower Internals
Specify PMI by alloy, component, examination percentage, test method and acceptance criteria. Control traceability through cutting, fabrication and field repair, and investigate every mismatch before tower closure.
P
Sep 15, 20265 min read
How to Control Vapor and Liquid Leakage Around Dividing-Wall Column Internals
Control dividing-wall leakage by defining allowable bypass, sealing every perimeter and penetration, checking differential-pressure deflection, accommodating thermal movement and verifying the completed boundary with a function-appropriate test.