P
Pingxiang Daier Separation TechSep 21, 20265 min read

Ceramic Packing Passes the Acid Test but Fails the Alkali Test: Should It Still Be Accepted?

When ceramic packing passes the acid-resistance requirement but fails the specified alkali-resistance limit, the supplier should first verify the test method and determine whether the alkali requirement is process-critical or contractually mandatory. A noncompliant result should never be hidden; alternative ceramic grades or other materials should be evaluated if the requirement cannot be changed.
P
Pingxiang Daier Separation TechSep 21, 20265 min read

What Can Be Decided When a Packed-Tower RFQ Does Not Include the Required Bed Height?

When a packed-tower RFQ does not include bed height, suppliers can still evaluate material compatibility, hydraulic suitability, packing size, and mechanical feasibility. However, final packing volume, total pressure drop, and guaranteed outlet performance should not be confirmed until the required mass-transfer duty and packed height are established.
P
Pingxiang Daier Separation TechSep 21, 20261 min read

How to Retrofit a Packed Tower with Persistent Foaming

Persistent foaming should be treated as both a process and hydraulic problem. Retrofit may involve more open packing, improved distribution, greater disengagement space, better mist handling, and changes to operating chemistry.
P
Pingxiang Daier Separation TechSep 21, 20261 min read

How to Retrofit a Packed Tower That Floods During Startup

Startup flooding can result from transient liquid loading, cold-fluid properties, rapid gas introduction, distributor behavior, or foaming. The retrofit should evaluate transient startup conditions separately from stable operation.
P
Pingxiang Daier Separation TechSep 21, 20262 min read

How to Retrofit a Packed Tower That Floods During Normal Operation

A tower that floods during normal operation should be investigated for fouling, excessive actual loads, maldistribution, restrictive supports, packing capacity, and upper-tower pressure loss. Retrofit should correct the specific hydraulic restriction rather than simply reducing production.