How to Retrofit a Packed Tower to Reduce Product Cross-Contamination Between Campaigns

Reducing product cross-contamination between campaigns requires attention to residual liquid in packing, distributors, collectors, feed piping, and low points. Retrofit should improve drainability and flushing while maintaining the hydraulic function required during normal production.
P
Pingxiang Daier Separation TechSep 21, 20262 min read

How to Retrofit a Packed Tower When Legacy Internal Materials Cannot Be Identifiedacy Internal Materials Cannot Be Identified

Unknown legacy tower-internal materials should be investigated through historical records, appropriate material verification, condition inspection, and new process-compatibility review. Critical components should not be reused based solely on visual assumptions, and the retrofit should create a reliable material record for the future.
P
Pingxiang Daier Separation TechSep 21, 20262 min read

How to Retrofit a Packed Tower When the Bottom Sump Becomes the Capacity Bottleneck

When the bottom sump becomes the capacity bottleneck, retrofit should evaluate total liquid balance, outlet nozzle, control valve, downstream piping, working volume, solids accumulation, gas-inlet interaction, and clearance below the packing support. Higher-capacity packing cannot solve insufficient liquid removal from the tower bottom.
P
Pingxiang Daier Separation TechSep 21, 20262 min read

How to Retrofit a Packed Tower When Gas Enters with Strong Swirl

Strong gas swirl entering an existing packed tower can bias flow toward the wall and reduce use of the full cross-section. Retrofit should identify the upstream swirl source, evaluate inlet-plenum length, use low-resistance flow straightening where justified, and consider interaction with the packing support and wall region.
P
Pingxiang Daier Separation TechSep 21, 20262 min read

How to Retrofit a Packed Tower When a Gas Inlet Nozzle Creates a High-Velocity Jet

A high-velocity side inlet can create severe gas maldistribution even when average tower velocity is acceptable. Retrofit should consider nozzle velocity, jet direction, distance to the bed, low-resistance flow conditioning, drainage, structural jet load, and evidence of localized hydraulic stress.