P
Pingxiang Daier Separation TechAug 19, 202610 min read

How to Calculate Multiple Packing Beds with the DAIER Engineering Assistant

Learn how to enter equal and unequal packing bed heights, calculate multiple packed sections, and avoid quantity errors in the DAIER Engineering Assistant.
P
Pingxiang Daier Separation TechAug 19, 20269 min read

How to Save and Share a Tower Packing Preliminary Engineering Report

Learn how to copy, save and share a preliminary tower packing engineering report from the DAIER Engineering Assistant for RFQ and project review.
P
Pingxiang Daier Separation TechAug 19, 202612 min read

Can the DAIER Tower Packing Engineering Assistant Select Tower Internals?

Learn whether the DAIER Tower Packing Engineering Assistant can select packing supports, hold-down grids and liquid distributors, and what requires separate engineering review.
P
Pingxiang Daier Separation TechAug 19, 202610 min read

Tower Packing Selection When Tower Diameter Is Not Yet Known

Learn what the DAIER Tower Packing Engineering Assistant can still do when tower diameter is not yet known, and which results require hydraulic design.
P
Pingxiang Daier Separation TechAug 19, 20269 min read

Automatic Mode vs Manual Mode in the DAIER Tower Packing Engineering Assistant

Learn when to use Automatic Mode or Manual Mode in the DAIER Tower Packing Engineering Assistant for preliminary screening and catalog comparison.