Pingxiang Daier Separation Tech Sep 7, 2026

Structured Packing RFQ Checklist: What Information Engineers Need Before Quotation

Structured Packing RFQ Checklist: What Information Engineers Need Before Quotation

A structured packing inquiry often begins with a simple request:

Please quote structured packing.

However, this information is usually not enough for an accurate engineering quotation.

Structured packing is not a universal product that can be selected only by quantity.

The correct solution depends on:

  • tower dimensions
  • process conditions
  • packing requirements
  • installation limitations
  • operating objectives

A complete RFQ helps suppliers provide:

  • correct packing selection
  • accurate pricing
  • suitable material recommendation
  • realistic delivery planning

The quality of the quotation depends heavily on the quality of the information provided.


Why a complete RFQ matters

Two customers may request the same product:

250Y structured packing

But the correct solution may be different.

Because the tower conditions may differ:

Customer A:

  • clean distillation service
  • high temperature
  • stainless steel requirement

Customer B:

  • corrosive scrubber
  • lower temperature
  • plastic packing requirement

The packing model alone does not define the complete solution.


Basic tower information required

The first section of a structured packing RFQ should include tower data.

Tower diameter

Required because it determines:

  • packing volume
  • module arrangement
  • hydraulic behavior

Packed height

Required because it affects:

  • separation capability
  • number of packing sections
  • installation planning

Available installation opening

Important information:

  • manway size
  • access limitation

This affects:

  • module size
  • segmentation

Tower drawings

If available, drawings help confirm:

  • internal dimensions
  • support arrangement
  • distributor position

A simple dimension mistake can create installation problems later.


Process information required

Structured packing performance depends on operating conditions.

Important process data include:

Application

Examples:

  • distillation
  • absorption
  • stripping
  • scrubbing

Operating pressure

Pressure affects:

  • gas volume
  • hydraulic behavior
  • packing selection

Temperature

Temperature affects:

  • material selection
  • fluid properties

Gas and liquid flow rates

Required for:

  • capacity evaluation
  • pressure-drop estimation
  • flooding analysis

Fluid information is critical

The packing contacts process fluids directly.

Provide:

Gas composition

Examples:

  • air
  • CO₂
  • H₂S
  • VOC
  • solvent vapor

Liquid composition

Examples:

  • water
  • amine
  • caustic solution
  • organic solvent

Corrosion information

Important for selecting:

  • SS304
  • SS316L
  • PP
  • PVDF
  • ceramic

Packing specification information

If the customer already has a requirement:

Provide:

Packing type

Examples:

  • 125Y
  • 250Y
  • 350Y
  • 500Y

Material

Examples:

  • stainless steel
  • plastic
  • ceramic

Surface area

Important for:

  • efficiency
  • pressure drop

Quantity

Usually required as:

  • sections
  • layers

Performance requirements

A good RFQ should explain the purpose.

Examples:

New tower

Need:

  • complete packing recommendation

Retrofit project

Need:

  • replacement evaluation

Capacity increase

Need:

  • higher throughput analysis

Efficiency improvement

Need:

  • higher separation performance

The supplier needs to understand the goal, not only the product name.


Existing tower problems should be included

For replacement projects, provide:

Current problem

Examples:

  • high pressure drop
  • low purity
  • flooding
  • insufficient capacity

Operating history

Useful information:

  • previous performance
  • maintenance records
  • shutdown inspection

Existing packing information

Include:

  • manufacturer
  • model
  • material
  • service time

This helps identify whether the issue is:

  • packing
  • internals
  • operation

Drawings and photos improve quotation accuracy

Useful attachments:

  • tower drawing
  • internal layout
  • packing support drawing
  • photos

Photos can reveal:

  • corrosion
  • fouling
  • installation limitations

Visual information often prevents misunderstanding.


Packaging and logistics information

For export projects, also consider:

  • destination
  • delivery term
  • required shipping method

Structured packing volume can be large but lightweight.

Transport planning depends on:

  • module size
  • packaging method
  • container utilization

Common RFQ mistakes

Mistake 1:

Only providing packing model.

Problem:

No process basis.


Mistake 2:

Only providing tower diameter.

Problem:

Cannot evaluate performance.


Mistake 3:

Ignoring installation limitations.

Problem:

Packing may not fit through access opening.


Mistake 4:

Comparing quotations without technical details.

Problem:

Different products may appear cheaper but are not equivalent.


Minimum RFQ checklist

Before requesting quotation, prepare:

✅ Application✅ Tower diameter✅ Packed height✅ Gas flow✅ Liquid flow✅ Pressure✅ Temperature✅ Fluid composition✅ Material requirement✅ Packing type requirement✅ Quantity✅ Delivery destination


Better RFQ creates better engineering solutions

Structured packing is a process component, not a simple commodity.

A supplier can provide much better support when the RFQ includes:

  • process information
  • equipment information
  • project objective

The result is:

  • more accurate quotation
  • fewer technical misunderstandings
  • lower project risk

A good RFQ is the first step toward a successful packed column design.

Structured Packing Hydraulic Design: Capacity, Loading Range & Operating Window

Structured Packing Cost Factors: Why Packing Price Is Not Only About Surface Area