P
Pingxiang Daier Separation TechSep 20, 20265 min read

Nominal Size Is Not Enough: How to Specify Dimensional Tolerances for Random Packing Procurement

Nominal random packing size is a product designation, not a complete dimensional acceptance requirement. Procurement specifications should define critical dimensions, realistic manufacturing tolerances, measurement methods, and sampling requirements according to packing material and geometry.
P
Pingxiang Daier Separation TechSep 16, 20266 min read

How to Build a Complete Tower Internals Data Book

A complete tower internals data book links design conditions, final drawings, material traceability, fabrication records, inspection results, hydraulic tests, shipping controls, field modifications, and future spare-part requirements. It enables correct installation, defensible acceptance, faster shutdown decisions, and accurate replacement procurement throughout the tower’s operating life.
P
Pingxiang Daier Separation TechSep 16, 20265 min read

How to Leak-Test Thin-Sheet Welds in Tower Internals

Thin-sheet tower internals require leak-test methods matched to their geometry, cleanliness, allowable load, and service consequence. Water fill, low-pressure bubble testing, vacuum-box examination, penetrant testing, and tracer-gas methods provide different information. Safe acceptance combines visual inspection, controlled test loading, complete coverage, documented repair, and mandatory retesting.
P
Pingxiang Daier Separation TechSep 16, 20265 min read

How PTFE Gasket Cold Flow Causes Leakage in Tower Internals

PTFE gaskets can lose thickness and bolt preload through cold flow, causing internal leakage even when the initial test was satisfactory. Reliable sealing requires rigid and aligned flange geometry, controlled gasket stress, adequate bolt spacing, extrusion resistance, staged tightening, temperature evaluation, and inspection after relaxation or thermal cycling.
P
Pingxiang Daier Separation TechSep 16, 20265 min read

How Rapid Depressurization Creates Reverse Loads on Tower Internals

Rapid depressurization can create temporary pressure differences between tower sections because gas inventories do not equalize instantly through packing and internals. These transient loads may act opposite to normal operation and can lift, buckle, or unseat panels. Safe design requires dynamic pressure evaluation, bidirectional structural checks, verified equalization paths, and targeted inspection after any abnormal depressurization event.