Scaffold legs and turnaround equipment impose concentrated, horizontal, and dynamic loads that tower internals may not be designed to carry. Safe temporary work requires an allowable-load map, verified structural bearing points, engineered spreaders, controlled material storage, review of hydroblasting and lifting forces, and inspection before and after use. Never infer load capacity from appearance or worker experience; provide a documented load path to qualified vessel supports.
P
Pingxiang Daier Separation TechSep 15, 20266 min read
How to Control Temporary Scaffolding Loads on Tower Internals During Turnarounds
P
Sep 15, 20266 min read
How Protective Coatings Change Tower-Internal Orifice Size and Hydraulic Performance
Protective coatings reduce and irregularly reshape tower-internal holes, slots, mesh openings, sliding clearances, and bolt fits. Reliable design specifies finished dimensions, accounts for maximum coating buildup and stripe coats, prepares edges correctly, controls application and curing, and verifies critical openings after coating. Flat-surface thickness readings alone cannot prove hydraulic suitability; final dimensional inspection and post-coating performance testing are often required.
P
Sep 15, 20265 min read
How to Prevent Caustic Stress Corrosion Cracking of Tower Internals
Caustic stress corrosion cracking can damage carbon-steel, stainless-steel, or other tower internals without major uniform metal loss. Risk depends on material condition, tensile stress, local caustic concentration, temperature, contaminants, and transient mixing or evaporation. Reliable prevention combines service-specific material selection, drainable geometry, controlled injection, low-restraint fabrication, qualified welding, targeted crack inspection, and formal review of every chemical or temperature excursion.
P
Sep 15, 20265 min read
How Mercury Can Damage Aluminum Tower Internals by Liquid-Metal Embrittlement
Elemental mercury can penetrate damaged oxide films, amalgamate with aluminum, and promote localized corrosion or liquid-metal embrittlement-related cracking of aluminum tower internals. Ordinary corrosion allowance does not control the risk. Prevention requires effective upstream mercury removal, representative monitoring, low-stress and damage-resistant internal details, controlled handling, and a defined response to breakthrough. Confirmed exposure demands specialist safety, inspection, and fitness-for-service assessment.
P
Sep 15, 20266 min read
How to Prevent Bolt-Hole Tear-Out in Thin-Sheet Tower Internals
Bolt-hole tear-out in tower internals results from bearing, shear-out, net-section rupture, pull-through, prying, or joint slip in thin sheet. Prevention requires realistic load distribution, adequate edge distance and spacing, controlled hole geometry, suitable washers or backing plates, minimum-thickness checks, compatible tightening, and strict field-modification limits. Bolt strength alone cannot demonstrate joint adequacy, and a deformed hole requires evaluation of the entire connection.