P
Pingxiang Daier Separation TechSep 11, 20263 min read

What to Include in a Tower Internals Inspection and Test Plan (ITP)

A tower internals ITP should control drawings, material traceability, fabrication, welding, dimensions, cleanliness, functional testing, trial assembly and final records. Every activity needs a defined acceptance criterion, responsibility and review, witness or hold status.
P
Pingxiang Daier Separation TechSep 11, 20263 min read

How to Specify Gaskets for Segmented Tower Internals

Gaskets for segmented tower internals must be selected from the required seal function, chemistry, temperature and joint mechanics. Material name alone is insufficient; compression, panel stiffness, bolt spacing, installation and testing determine whether the joint remains sealed.
P
Pingxiang Daier Separation TechSep 11, 20264 min read

How Weir-Notch Geometry Controls a Trough Liquid Distributor at Low Flow

V-notches, rectangular slots and overflow crests produce different relationships between liquid head and discharge. Low-flow performance depends on notch shape, crest elevation, levelness, surface condition and fouling—not simply the number of openings.
P
Pingxiang Daier Separation TechSep 11, 20263 min read

How Vapor-Riser Cap Geometry Affects Collector Tray Performance

Vapor-riser cap overlap keeps descending liquid out of the vapor opening, while cap clearance and lateral discharge area control vapor velocity and pressure drop. Cap drainage, supports and interaction with the collector outlet must also be included in the design.
P
Pingxiang Daier Separation TechSep 11, 20263 min read

How Liquid Distributor Holdup Affects Heat-Sensitive or Reactive Service

Liquid held in distributor pans, troughs and dead zones adds residence time and hot inventory. Heat-sensitive or reactive services require a deliberate balance between stable metering head, distribution quality, drainability and allowable product exposure.