P
Pingxiang Daier Separation TechSep 20, 20264 min read

Surface Contamination on New Ceramic Packing: Can Dust, Oil or Handling Residue Affect Tower Performance?

New ceramic packing may contain limited transport dust without being defective, but oil, excessive fines or foreign material can affect initial wetting and process cleanliness. Inspect the shipment and use a compatible flushing or cleaning procedure where the process requires it.
P
Pingxiang Daier Separation TechSep 20, 20264 min read

Why Is Ceramic Tower Packing Usually Unglazed? Surface Wetting and Mass Transfer Explained

Ceramic packing is commonly unglazed because mass-transfer service benefits from a naturally wettable ceramic surface. Surface finish affects liquid spreading, but wettability must still be considered together with packing geometry, liquid distribution and operating load.
P
Pingxiang Daier Separation TechSep 20, 20264 min read

Abrasion Resistance of Ceramic Packing: When Does Wear Matter Inside a Packed Tower?

Ceramic hardness helps resist wear, but abrasion can become important in towers handling solids, crystals or high-velocity particles. Evaluate particle loading, bed movement and local velocity rather than assuming ceramic packing is immune to mechanical erosion.
P
Pingxiang Daier Separation TechSep 20, 20265 min read

Ceramic Packing Crushing Strength vs Compressive Strength: What Do the Test Values Actually Mean?

Compressive strength is generally a stress-based material property, while crushing strength often describes the force required to break a finished ceramic piece. Because ceramic packing geometry strongly affects failure, mechanical test values must be compared using similar specimens and test methods.
P
Pingxiang Daier Separation TechSep 20, 20264 min read

Ceramic Packing Dimensional Tolerance and Firing Shrinkage: Why Size Variation Is Normal

Ceramic packing shrinks during drying and firing, so nominal size is not an exact piece-by-piece dimension. Controlled tolerance, wall thickness and consistent firing matter more than expecting zero variation. Replacement projects should compare several actual samples rather than relying on one measurement.