Can Ceramic Packing Be Used with Hydrofluoric Acid? Why HF Is Different

Conventional silica-containing ceramic packing should not automatically be used in hydrofluoric-acid service. HF can attack silica-containing ceramic phases even when the material performs extremely well in many other acids. Always identify fluoride content explicitly during material selection.
P
Pingxiang Daier Separation TechSep 20, 20265 min read

What Is Acid-Resistant Ceramic Packing? Material, Properties and Engineering Limits

Acid-resistant ceramic packing is an effective choice for many corrosive and high-temperature packed towers, but its resistance is chemistry-specific. Proper selection requires checking chemical compatibility, temperature, physical properties and mechanical installation conditions rather than relying on the ceramic label alone.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

How to Create an As-Built Technical Baseline for Future Tower Internals Replacement

The as-built baseline for tower internals should preserve final product identity, materials, geometry, tower interfaces, approved deviations, drawings, certificates, operating information, installation lessons, photographs, and links to the MDR for future replacement procurement.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

When Does Technical Acceptance Occur for Tower Internals? Factory Inspection vs Delivery vs Installation

Tower-internals contracts should distinguish factory inspection, shipment release, delivery/receiving acceptance, installation acceptance, and any operational performance acceptance instead of treating “acceptance” as one undefined event.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

Shortage, Damage or Nonconformity After Delivery: How to Determine Where the Problem Occurred

After delivery, shortages, manufacturing defects, transport damage, and site-handling damage should be investigated separately using package reconciliation, photographs, piece marks, inspection records, drawings, and shipment evidence before responsibility is assigned.