Unsupported feed piping can transfer weight, thermal force, vibration and misalignment into a liquid distributor, causing distortion and flow maldistribution. Feed-pipe and distributor load paths, thermal movement, supports and installation tolerances must be coordinated before fabrication.
P
Pingxiang Daier Separation TechSep 12, 20264 min read
Why Feed Piping Should Not Load the Liquid Distributor
P
Sep 12, 20264 min read
How to Measure Liquid Distributor Flow Uniformity with a Catch-Pan Test
A catch-pan test measures local distributor flow, calculates statistical variation and reveals spatial dry or overloaded zones. Reliable acceptance requires area normalization, mass-balance checking, minimum-to-maximum flow testing and predefined criteria rather than visual judgment alone.
P
Sep 11, 20264 min read
How to Design Removable Access Panels in Tower Internals
Removable access panels must fit the real maintenance route while preserving the internal’s load path, sealing and flow area. Operability, panel weight, captive hardware, positive locking and shop trials should be specified before fabrication.
P
Sep 11, 20264 min read
Final Tower Closure Inspection Checklist Before Startup
Final tower closure inspection verifies configuration, supports, packing, distributors, collectors, seals, fasteners, access panels and cleanliness after all installation work is complete. Photographs, punch-list closure and cross-functional sign-off create a defensible startup record.
P
Sep 11, 20263 min read
What to Include in a Tower Internals Inspection and Test Plan (ITP)
A tower internals ITP should control drawings, material traceability, fabrication, welding, dimensions, cleanliness, functional testing, trial assembly and final records. Every activity needs a defined acceptance criterion, responsibility and review, witness or hold status.