P
Pingxiang Daier Separation TechSep 20, 20262 min read

Liquid Distributor RFQs: What Information Must Be Available Before a Supplier Can Design the Outlet Layout?

Liquid distributor design-ready RFQs should include tower ID, liquid flow range, fluid properties, feed-nozzle details, obstructions, distribution requirements, fouling information, manway access, and package scope.
P
Pingxiang Daier Separation TechSep 20, 20262 min read

Vane Mist Eliminator RFQs: What Data Determine the Quoted Vane Geometry?

Vane mist eliminator RFQs should define flow orientation, gas conditions, liquid properties, pressure-drop limits, removal requirements, material, drainage, and module access so that the quoted vane geometry has a clear engineering basis.
P
Pingxiang Daier Separation TechSep 20, 20262 min read

Wire Mesh Demister RFQs: What Information Is Needed Before a Supplier Can Finalize the Design?

Wire mesh demister RFQs should include gas conditions, liquid service, required mesh construction, vessel dimensions, manway access, pressure-drop constraints, and support scope before the design is finalized.
P
Pingxiang Daier Separation TechSep 20, 20262 min read

Ceramic Structured Packing RFQs: What Data Should Be Agreed Before Production?

Ceramic structured packing procurement should define tower dimensions, element geometry, ceramic material requirements, manway access, packaging, spare quantity, and documentation before production approval.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

Plastic Structured Packing RFQs: Which Project Data Affect Both Price and Manufacturability?

Plastic structured packing RFQs should include polymer requirements, operating conditions, tower dimensions, access limitations, support scope, and packaging needs before a firm fabrication quotation is accepted.