P
Pingxiang Daier Separation TechSep 20, 20264 min read

How to Verify Structured Packing Diameter and Tower Fit Before Shipment

Wire mesh demister density and thickness should be verified using a defined measurement condition, mesh-only weight basis where appropriate, multiple thickness readings, and checks for uniformity across sections.
P
Pingxiang Daier Separation TechSep 20, 20262 min read

How to Inspect Structured Packing Geometry Before Shipment

Pre-shipment inspection of structured packing should confirm corrugation geometry, sheet thickness, surface features, element dimensions, edge construction, orientation, and cleanliness against the approved design.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

Ceramic Packing Lot Release: How Should COA Results Be Linked to the Actual Shipment?

Ceramic packing lot release should connect production-lot identification, package marks, required tests, COA results, and sampling records so that the certificate represents the actual material shipped.
P
Pingxiang Daier Separation TechSep 20, 20262 min read

How to Inspect Plastic Random Packing for Flash, Warpage and Incomplete Molding

Plastic packing should be inspected for complete molding, acceptable flash, controlled warpage, structural cracks, gate condition, contamination, and lot consistency using representative samples across the shipment.
P
Pingxiang Daier Separation TechSep 20, 20263 min read

Visual Defect Acceptance Criteria for Stamped Metal Random Packing

Visual acceptance criteria for stamped metal random packing should distinguish functional defects from minor cosmetic variation. Inspection should focus on geometry, structural integrity, cleanliness, and production consistency.